B
Bigevildoer
Guest
Re: The Official 2011 Kitchener-Waterloo and surrounding areas thread.
If i could afford the Diavel right now, it would be in my garage! Never knew you had a Tuono - was looking at an RSVR Factory to replace the Buell actually... may hold off on that idea (mechanic I trust implicitly told me about brake fluid issues (have to replace several times a year to be safe etc)). When Babs (Bad As* Bit**) runs, she's like a siren to me, calling me - begging for a ride, distracting me at work, then grabbing hold and ripping me all to pieces! Love it! But, when she's being a pain, egads... the parts lead time is absolutely miserable (average 4-6 weeks for just about anything beyond nuts and bolts (which are 2 weeks minimum - Torx with funky threads)).
Tim, sorry to hear your bike is causing you grief... I hate that. That was part of the reason that I sold my Aprilia Tuono last year. I couldn't trust that it wouldn't leave me stranded. Time for the Diavel?
If i could afford the Diavel right now, it would be in my garage! Never knew you had a Tuono - was looking at an RSVR Factory to replace the Buell actually... may hold off on that idea (mechanic I trust implicitly told me about brake fluid issues (have to replace several times a year to be safe etc)). When Babs (Bad As* Bit**) runs, she's like a siren to me, calling me - begging for a ride, distracting me at work, then grabbing hold and ripping me all to pieces! Love it! But, when she's being a pain, egads... the parts lead time is absolutely miserable (average 4-6 weeks for just about anything beyond nuts and bolts (which are 2 weeks minimum - Torx with funky threads)).