Lower Faraday Rd (getting repaved)

Drove my car up Dyno Road last Saturday and it is in great shape after being completely rebuilt in 2019/2020.

Looks like it has been widened a bit and have pruned some trees for clearer site lines but thankfully retained the elevation changes and twists while providing a predictable surface.

The surface appears to be a hybrid of asphalt and chips and looks like it has grooves pressed in for wet traction.
Still one of the most entertaining short stretches of tarmac in Ontario.
 
What's the latest on Lower Faraday Rd?
Might be headed up there next week on my R6
 
Rode it a few weeks ago, the north-end is in good shape as it was resurfaced a few years ago. However, the less populated middle and lower sections has been patched (chop and seal) with most of the pot holes filled.

Depending on your approach, the bridge at the top of 504 is still closed so you have to by-pass on a nicely graded dirt and gravel Glen Alda Rd. to 620..
 
Does anyone know if Lower Faraday Road is paved all the way now? I heard that there was more construction this summer and there were gravel sections.
 
Back
Top Bottom