Snake Road Bridge Open | GTAMotorcycle.com

Snake Road Bridge Open

DoubleJ

Well-known member
Announced in the Hamilton Spectator this morning that the railway bridge is now open to all traffic.
 
3 years lol where you been, coma? BTW i just drove it, looks very artfully done.
 
That thread said it actually closed the afternoon of July 10th not the april date as planned so 9 months closed.
 
Was better when it was closed there was till lots of room to get on and off at the closed end with a bike

sent from a device using a program
 

Back
Top Bottom