I was there last week and all was well. Today was a different story.
The north part of the parkway (from Clifton Hill to NotL) has a good portion of grooved pavement. It looks like they are going to resurface most of it, which is good because it has needed it for a while.
I am not sure about the southern half though (from Clifton Hill to Fort Erie), I've not visited that portion recently.
EDIT: It's all done now (see post #5).
The north part of the parkway (from Clifton Hill to NotL) has a good portion of grooved pavement. It looks like they are going to resurface most of it, which is good because it has needed it for a while.
I am not sure about the southern half though (from Clifton Hill to Fort Erie), I've not visited that portion recently.
EDIT: It's all done now (see post #5).
Last edited: