justride
Well-known member
As of Saturday Sept 15 2018
hwy 518 east of Blackwater Lake Road to/almost to Sprucedale is undergoing road work, it's all gravel now.
When riding down Blackwater Lake Road I took a look at 518 westward and saw contrucstion vehicles and more gravel but don't know how far it went.
FYI Blackwater Lake Road from Broadbent to hwy 518 is not paved. hard pack dirt and gravel.
hwy 518 & hwy. 2 Sitisted Rd S/Ravencliff. there is little bit of road work at the begining (maybe 1km) but it's all good after that.
didn't get a chance to do Southdown 13 hopefully there is road work planned for the year...this year
hwy 518 east of Blackwater Lake Road to/almost to Sprucedale is undergoing road work, it's all gravel now.
When riding down Blackwater Lake Road I took a look at 518 westward and saw contrucstion vehicles and more gravel but don't know how far it went.
FYI Blackwater Lake Road from Broadbent to hwy 518 is not paved. hard pack dirt and gravel.
hwy 518 & hwy. 2 Sitisted Rd S/Ravencliff. there is little bit of road work at the begining (maybe 1km) but it's all good after that.
didn't get a chance to do Southdown 13 hopefully there is road work planned for the year...this year